Note Flash Plugin Required - Refresh after installing.
CPS430 - Monday, September 25, 2017   
Information
FAQ

Minimum Public Disclosure and Consultation Requirements

Facility Calculator


Facility Calculator | Pipeline Calculator | Well Calculator
*Facility Type:SWEET FACILITY
- Gas-processing facility
- Straddle gas plants
- Gas battery  multiwell only
- Oil/bitumen battery  multiwell only
- Oil/bitumen battery satellite(2)
- Compressor station/pump station
- Tank farm/oil loading and unloading facility
- Custom treating plant
- Injection/disposal facility
SOUR FACILITIES
(<1 tonne/day sulphur inlet)
- Gas-processing facility
- Gas battery - multi- and single well
- Oil/bitumen battery  multi- and single well
- Oil/bitumen battery satellite(2)
- Compressor station/pump station
SOUR FACILITIES
(>= 1 tonne/day sulphur inlet)
- Gas-processing facility
- Gas battery  multi- and single well
- Oil/bitumen battery  multi- and single well
- Oil/bitumen battery satellite(2)
- Compressor station/pump station
SULPHUR RECOVERY FACILITIES
- Sulphur recovery facilities
*Marks required fields for the form above.
Notification Radius | Public Disclosure | Print Options